Area of the territory 879 sq. m
Location Entrance district, house 13/4
Bathhouse mkr. Entrance
General information
Year of construction 1965.
Number of floors 1.
It is used according to the agreement on the transfer of property of the municipal treasury for gratuitous use.
Steam rooms with electric heating.
Water supply: 6,01 cubic meters/day.
Power supply: 76,25 kW
Heating: 0,0298 Gcal/hour
DHW: 0,1190 Gcal/hour
Land plot 879 M2
Built-up area 430,4 M2
Total area 289,3 M2.
Description of the building's structural elements
|
Name of the structural element |
Description |
Technical condition |
|
Foundation |
Concrete Tape |
Cracks, uneven precipitation |
|
Exterior and interior walls |
Brick buildings |
Cracks, weathering of seams |
|
Partitions |
Brick buildings |
Cracks |
|
Overlaps |
Reinforced concrete |
Cracks |
|
Roof |
Slate on a wooden crate |
Damage to the top layer, leaks, the crate is deformed, affected by mold, cracks |
|
Floors |
cement plants |
Potholes, cracks |
|
Porches, blind area |
|
Cracks |
|
Sanitary and electrotechnical devices |
||
|
Central heating |
From the local boiler house |
Pipe rust |
|
Water supply |
From the city network |
Pipe rust |
|
Electric lighting |
Hidden wiring |
Loss of elasticity in the wires |
|
Hot water supply |
Centralized through a heat exchanger |
Pipe rust |
|
Sewage system |
To the city network |
|