Entrance district, house 13/4

Bathhouse Entrance district

General information

 

The year of construction is 1965.

The number of floors is 1.

It is used according to the agreement on the transfer of property of the municipal treasury for gratuitous use.

Steam rooms with electric heating. 

Water supply: 6.01 cubic meters/day.

Power supply: 76.25 kW

Heating: 0.0298 Gcal/hour

DHW: 0.1190 Gcal/hour

Land plot of 879 M2

Built-up area 430.4 M2

The total area is 289.3 M2.

 

 

Description of the building's structural elements

Name of the structural element

Description

Technical condition

Foundation

Concrete Tape

Cracks, uneven precipitation

Exterior and interior walls

Brick buildings

Cracks, weathering of seams

Partitions

Brick buildings

Cracks

Overlaps

Reinforced concrete

Cracks

Roof

Slate on a wooden crate

Damage to the top layer, leaks, the crate is deformed, affected by mold, cracks

Floors

cement plants

Potholes, cracks

Porches, blind area

 

Cracks

Sanitary and electrotechnical devices

Central heating

From the local boiler house

Pipe rust

Water supply

From the city network

Pipe rust

Electric lighting

Hidden wiring

Loss of elasticity in the wires

Hot water supply

Centralized through a heat exchanger

Pipe rust

Sewage system

To the city network

 

 

Website by
Issues with state support for businesses — tell us about it