Russian Deputy Prime Minister Victoria Abramchenko and Head of the region Vitaly Khotsenko visited the construction site of the Solnechny logistics Park

Victoria Abramchenko, Deputy Prime Minister of the Russian Federation and curator of the Siberian regions, began a working trip to the Omsk Region to get acquainted with the implementation of a large-scale investment project in the region.

The project involves the construction of a logistics park for large retail chains and logistics operators. The Russian Deputy Prime Minister assessed the progress of the project, which is under her supervision.

"We have agreed with Vitaly Pavlovich that we will hold such meetings regularly. The first meeting was held in Moscow, and we agreed on plans for the socio-economic development of the region.  After all, it is important for residents of Omsk not only to solve environmental problems, but also to create such sites that will provide new jobs and close the accumulated problems of the region. This distribution center solves a number of problems in the region's trade. I consider it an abnormal situation when an Omsk entrepreneur who produces food products in order to prepare them for sale according to quality standards for federal chains is forced to apply to a neighboring region. And now, by ensuring the construction of such a complex, we are removing this problem. This will solve the problem of rising prices associated with logistics costs for residents of Omsk, and solve the problem of food quality – they will be fresh and delivered faster," said Victoria Abramchenko.

The project is included in the register of large-scale investment projects of the Omsk region, therefore, the investor has been provided with land plots for rent without bidding for its implementation. At the federal level, the investment project is supported by an infrastructure budget loan in the amount of more than 200 million rubles. The funds were used by the investor to connect to engineering infrastructure facilities such as electric grids, water supply and fire protection networks, sewerage and gas supply systems. Solnechny Logopark is the first major project in the Omsk Region aimed at developing the transit and logistics potential of the region. 

"This is a big project. Victoria Valeryevna personally accompanies. They helped us take out an infrastructure loan, and we are transferring it to the company to reimburse infrastructure costs. We have never had such facilities before. 2,500 people will work here, and the first stage of the facility will open in the very near future. All federal networks are represented here. The total area of the premises is more than 200 thousand square meters. meters. These are jobs, huge investments and tax revenues to the budget, which we estimate at least 400 million rubles per year," explained the head of the region, Vitaly Khotsenko.

The Solnechny Logopark is located on the Left Bank of Omsk. The investment capacity of the project is estimated at 10.6 billion rubles.

The implementation involves the phased commissioning of storage facilities from 2023 to 2025. The total storage area will exceed 200,000 square meters. It is planned to provide employment for about 2.5 thousand people within the framework of tenants' logistics facilities.
The construction of the first stage of the distribution center is currently being completed, with an area of almost 30 thousand square meters.m. The storage facilities are intended for X5 Retail Group, a Russian retail company that manages grocery retail chains. Installation of the shelving equipment has begun. 

The second stage is a universal warehouse. And the third stage will be built specifically for the Ozon company. 

All warehouses will be of class "A", multi-temperature complexes that are difficult from the point of view of engineering, because different storage modes of goods, products, and the same fruits and vegetables are required in different rooms. For example, there is a separate chocolate chamber. There will be cold storage rooms with low-temperature freezing of -25. But there is also just a dry warehouse with a normal temperature.

Website by
Issues with state support for businesses — tell us about it